Thursday, October 21, 2010

aluminum goes back on

tail lights








 12 volt wiring




cleaning off old seal.




Putting on new seal





Friday, October 1, 2010

Insulated

Twenty bucks well spent to reinforce cuts in panels without leeching through the panel.

Liquid nails used to fill the relief cuts in plywood to strengthen and avoid future stress fractures.

Relief cuts every inch allow insulation to make the bend.


Temporary wood strips hold insulation in place while glue dries.





Thursday, September 30, 2010

Framed up

Roof vent framed up and ready to be cut out.




All framed up.





Monday, September 20, 2010

The walls go up

walls secured on bottom



walls squared up



relief cuts made half the width through the 1/4 inch ply birch allowed it to make the bends without cracking




pay backs





several pieces of 1/4 inch ply make up the crown in order to make the bends

crown and frame going up



looking good inside


the framing of the window going up






Preping the trailer

wooden deck sanded and metal ground with a wire wheel and a grinder

metal straightened and ground clean

metal cleaned before prime and paint



metal all primed


wheel well painted even though hidden behind cabinets


kids enjoying the sanded and painted trailer


new paint


new safety chain


old wiring


new wiring


Trailer wiring is done